Racon Engineering Facility
Audit Service Offering is tailored to suit the project and
provides the client with a comprehensive report identifying all
risks related to minimizing down time. The following is a sample
of a typical site with significant central plant dependency. We
will be pleased to provide you a proposal for your specific site.
- Review drawings and all documentation pertaining
to the mechanical systems that support the data centre. The purpose
of the review is to gain an understanding of the systems and their
functions. It will reveal single points of failures and enable
us to highlight weak points in the design and implementation.
- Participate in staff interviews for data gathering
- Review building systems as required that may
have a direct or indirect impact on the reliability of the data
center.
- Review electrical, mechanical and architectural
systems for all auxiliary rooms that support the data center i.e.
Battery Room, Electrical Distribution Rooms etc.
- Conduct a physical audit of all mechanical
and electrical systems for the data center.
- The following systems will be reviewed:
- Chilled water air conditioners
- Sprinkler Systems
- Fire Suppression System
- Raised Floor System
- Architectural Systems including doors,
partitions, etc.
- Water Detection Systems
- Flood risks from all sources
- Chiller and chilled water distribution
- Cooling Tower, heat plate exchangers for
free cooling
- Pneumatic controls, redundancy and control
sequence
- Air distribution in the data center
- Electrical Distribution
- Security
- Fire Detection
- Physical Security
- Transient Voltage Surge Suppression
- We will measure carbon dioxide levels over
a period of time to gage the effectiveness of the ventilation
system.
- We will chart temperature readings across the
data center to determine the effectiveness of the air distribution.
- We will produce layouts on CADD that will be
used for the purposes of describing results and findings.
- Take electrical load readings where possible
to gage utilization.
- Analyze audit information.
- Produce draft audit report.
- Prepare budgets for recommendations.
- Review feedback and make revisions to report.
- Submit finished report.
- Ask us for our check list that will be used
in the Data Centre Audit
Customer Responsibilities
- Provide as built drawings of all base building
mechanical systems including, HVAC, plumbing, cooling tower, pneumatic
controls and compressors, chillers, fan coil units, schematics,
pumps, exhaust fans, duct layouts, exhaust system and controls
for battery rooms and electrical distribution rooms; water detection
system; sprinkler systems; clean agent extinguishment system;
heat exchanger and controls etc.
- Provide shop drawings for all associated equipment.
- Provide information on set point for all equipment
if available. This will include set points for free cooling, chillers,
central air handling equipment etc. If not available in documented
format; we can discuss this at interview stage.
- Schedule maintenance personnel, internal or
third party for running any machinery as required.